MEP engineering services for the 20 Five-Year Plan/Building Condition Survey.Īrchitect of Record and photo credit: Gordon W.$3.9 million 2010 Capital Improvement and EXCEL Projects which included a new hot water system with pumps and air conditioning upgrades fire alarm, security and rescue assistance signal system upgrades and upgrades and renovations of restrooms and shower rooms to meet ADA requirements.The office is not staffed full time and those needing law. The branch office for the Holland area Sheriff’s Office operations is located in the rear of the Holland Charter Township Fire Station 2, located at 12169 James St (James St west of US31). $5.6 million 2016 High School Renovations to include new packaged rooftop air conditioning units, new panelboards, door access/intrusion system, emergency egress lighting, and various plumbing improvements. 29 square miles and has a population of 35,636 (2010 census).2016 Capital Outlay Project involving electrical design for door access upgrades at the high school.Renovations for ADA accessible toilet rooms are being done at the high school, middle school and bus garage. Work at the middle school includes replacement of roof top exhaust fans and relief intake hoods, new pool dehumidification unit, and replacement of main electrical service and emergency lighting. Buffalo Engineering has provided design and construction administration services for District projects since 2009.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |